top of page

River Restoration

An exciting project on an important tributory of a renowned Scottish salmon river. A historic weir had been put in place to divert flow to an old mill had become defunct and recognised as a bottleneck, impeding the run upstream to salmon spawning grounds and allowing the fish to be more easily predated here. The substantial weir had caused the river to back up a lot of sediment upstream, become a flood spot and diverge into several smaller channels. The project included the removal of fencing, clearance of the considerable weir area, tree felling, creation of access and stripping back the soil layers to create a clean site to work from. The river was realigned by rebuilding the banks, installing trees with their root plates being utilised as bank protection, doubling as habitat for the waters inhabitants. Dug in and ballasted by heavy rock they offer a green solution to bank erosion. the silt was removed, the river regraded and the banks dressed, netted and pegged with coir mat. Finally the banks were planted with suitable trees to further knit the soil together, offer increased habitat and give shde to the water, cooling it in hotter weather. Large woody structures were also installed further downstream to encourage habitat development and biodiversity. We love this type of project. Other works in various locations have involved remeandering formerlly straightened watercourses, returning them to something more natural, reconnecting floodplains and formation of backwaters and pools with fine gravels suitable for fish breeding. These projects follow strict compliance with regulations for working in the water including use of sediment control and avoidance of the habitat of water voles etc.
bottom of page